Directorate-General for Lunar & Maritime Cohesion · Horizon Lunar Cohesion Fund

LUNACY-2

Celestial Biodiversity Reduction Initiative
“A cleaner ocean. A warmer Latvia. Fewer questions.”
POWERED BY THE MOON. FUELLED BY FAST FASHION.
Funding request€47,382,000
LocationBaltic Sea – Strategic Latvian Deployment
Grant referenceHLC-2026-CBRI-047
Budget consumed€31,947,220

⚠ FICTIONAL SATIRE. LUNACY-2 is an imaginary concept for entertainment. It is not a real project or engineering design and is not affiliated with or endorsed by the European Union, any fashion retailer or the Republic of Latvia. All values are simulated in your browser. No fish, people or personal data are involved.

SYSTEM STATUSNOMINAL MODENORMAL OPERATION SIM CLOCK— TIDE— GRID EXPORT— HEAT TO RIGA—
DWG LUN-2-GA-001 · REV F GENERAL ARRANGEMENT SECTION A–A · SIDE ELEVATION SCALE 1:400 (VERTICAL ×3) STATUS: APPROVED IN PRINCIPLE T1-A T1-B T2 DISTRICT HEATING MAIN DN1400 → RIGA HVDC EXPORT 330 kV → EXHAUST & STEAM VENT certified “mostly steam” TEXTILE DESCENT SHAFT 41 m · bucket elevator TRU-1 STEAM DRUM HX-1 FAST FASHION THERMAL RECOVERY UNIT TEXTILE → HEAT CONVERSION HALL GEN — THERM — TIDE — MOON — STATUS NOMINAL CENTRAL CONTROL ROOM — — LUNAR ELECTRODYNAMICS CONTROL CENTRE TX-1TX-2 Σ — MW ELECTRICAL DISTRIBUTION SYNC SYNC — MENSTRUAL SYNCHRONISATION OBSERVATORY — ZODIAC CONTROL MODULE T-01T-02 HOMOGENISER BIOMASS INTAKE* AQUATIC BIOMASS PROCESSING FISH PASTE DIVISION LUNACY-2 · SUBSEA PROCESSING COMPLEX · DEPTH 41 m · EU-LUN/2026/047 FISH PASTE + TEXTILE RESIDUE – OPTIMISED CO-PROCESSING SEABED · −41 m · BALTIC PROPER (FICTIONAL SITE) MV FREE RETURNS FEED CONVEYOR CV-01 FAST FASHION RETURNS INTAKE FUNNEL ► Ø32 m · threaded rim M32000×400 INTERNAL THREAD ↻ TAMPER-RESISTANT · DO NOT REMOVE · CANNOT REMOVE NON-REMOVABLE PLASTIC SCREW CAP – EU COMPLIANCE EDITION DG-1 · BACKUP DIESEL · ADDED LATER (CHANGE ORDER CO-117) EGHR-1 EXHAUST HEAT → RIGA V12 · 9.5 MW ALT DIESEL ▼ REFUELLING ▼ FGO-1 · FLOATING GOVERNANCE OFFICE · OMBUDSMAN · HR · COMPLIANCE MEETING COFFEE — ▽ MSL ±0.00 m ⚠ TOTAL SYSTEM FAILURE ⚠ CAP INTEGRITY 100% · EVERYTHING ELSE: NOT GREAT EMERGENCY STOP ENGAGED SUPPLEMENTARY FUNDING REQUESTED
POWERED BY THE MOON. FUELLED BY FAST FASHION. ↻ Rotate your device for the full elevation. Hover or tap any subsystem for technical details · Keys 1–8 modes · Space pause · R reset · E emergency stop
SYSTEM STATUS: NOMINALALL SUBSYSTEMS WITHIN SELF-ASSESSED TOLERANCES
Electrical generation
—
—
Thermal generation
—
—
Clothing intake
—
—
Furnace temperature
—
—
Tidal state
—
—
Lunar phase
—
—
Zodiac alignment
—
—
Menstrual sync status
—
—
Waste processing
—
—
Marine environment
—
—
Backup diesel DG-1
—
—
Crew on duty
—
—
Doubles down on every press.
Electrical MWThermal MWSync %last 60 s

OPERATIONS LOG · REPORTS, MEMOS & AUTOMATIC COMPLIANCE NARRATIVE

Lunar Electrodynamics Control Centre

SUBSYSTEM L-EDCC · TIDAL PREDICTION · FREE-RUNNING
DECLINATION
Phase
—
Illumination
—
Lunar age
—
Declination
—
Pred. tidal height
—
Pred. current
—
Next high water
—
Spring/neap
—
Night haulier
—
NOW +24 h forecast
Baltic tidal range is naturally ~2 cm. LUNACY-2 applies Delegated Regulation LUN-2026/7, which amplifies it administratively. Phase initialised from the real Moon at page load, then accelerated.

Zodiac Control Module

SUBSYSTEM Z-CM · ALIGNMENT AUTOMATIC
♏
ASTROLOGICAL OPERATIONAL EFFICIENCY
—
Active sign
—
Element
—
Ruling subsystem
—
—
Click any sign on the wheel to override the alignment manually. Overrides are logged and reviewed by the Committee on Celestial Governance.

Menstrual Synchronisation Observatory

SUBSYSTEM MSO · RESEARCH WORKSTATION RW-1 · —
DAY 1 SYNC —
Sync status
—
Sync index
—
Reference day
—
Reference phase
—
Lunar lag
—
● Pink marker: simulated reference cycle (28 d)
● Cyan marker: lunar cycle (29.53 d)
Data source: SIMULATED reference model only. Personal data collected: NONE. Data transmitted: NONE. Observatory staff: 0. The hypothesis that anything here is synchronised with anything else remains, scientifically speaking, a hypothesis.

Fast Fashion Thermal Recovery & Heat Distribution

SUBSYSTEMS TRU-1 · HX-1 · DHN-RIGA
— MW delivered to Riga district heating
Clothing intake
—
Furnace temperature
—
Furnace thermal output
—
Diesel exhaust heat (EGHR-1)
—
Heat distribution efficiency
—
Estimated delivered heat
—
Riga households warmed
—

Tidal Generation Array

SUBSYSTEMS T1-A · T1-B · T2 · DUCTED HAT Ø32 m
— MW electrical
T1-A
—
T1-B
—
T2
—
Current direction
—
Current speed
—
Rotor speed (T1-A / T1-B / T2)
—
Energy exported (session)
—
Capacity factor
—

Backup Diesel Generation DG-1

SUBSYSTEMS DG-1 · EGHR-1 · STATUS —
— MW electrical (diesel)
SHARE OF ELECTRICAL OUTPUT
Tidal —Diesel —
Grid demand (Latvia)
—
Gap the tidal plant can’t cover
—
Engine load
—
Engine speed
—
Exhaust heat to Riga (EGHR-1)
—
Fuel on board
—
Consumption
—
CO₂ emissions
—
Fuel cost (session)
—
Running hours (“temporary”)
—
Reported renewable share
100.0 %*
Added as an afterthought. DG-1 was not in the original design. It was bolted on through Change Order CO-117 after commissioning showed the plant was insufficient on its own and could not provide consistent output when demand is high. The Baltic has almost no tide, so DG-1 now runs almost all the time. *Its output is classified as “lunar backup” under Delegated Regulation LUN-2026/7, Annex IV (“the Moon was busy”). Exhaust heat is recovered by EGHR-1 and sold to Riga as “Baltic moonwarmth”.

Shift B Crew · Tasks & Reports

CLICK “REPORT” HERE, OR CLICK A CREW MEMBER IN THE FACILITY, TO REQUEST A STATUS REPORT

Floating Governance Office FGO-1

OMBUDSMAN · HR · COMPLIANCE · KPI OWNERSHIP · STAKEHOLDER ALIGNMENT · CLICK “MEMO” (OR A BUREAUCRAT IN THE OFFICE) FOR A MEMO
Bureaucrats per operator
—
target: more
Administrative headcount
—
—
Memos issued
0
read: 0
Forms stamped
0
in triplicate
Ombudsman complaints
0
resolved: 0
In meetings right now
0
about other meetings

Biomass Division & EU Compliance

SUBSYSTEMS ABP-1 · WASTE YARD W-1 · DNSH SELF-ASSESSMENT
Aquatic biomass intake
—
Fish-paste output
—
Textile residue
—
Co-processing pile
—
Biodiversity reduction
—
Questions received
0 (target: 0)
  • Do No Significant Harm — self-assessed by the applicant
  • EU Taxonomy aligned (lunar annex)
  • Tethered cap directive — exceeded
  • Gender mainstreaming — observatory installed
  • Diverse workforce — 10 crew, 9 nationalities, 1 part-time werewolf
  • Administrative oversight — bureaucrats outnumber operators
  • Renewable share — 100% (diesel reclassified as “lunar backup”)
  • Celestial cohesion — Moon consulted (no reply)
  • Budget absorption on track